السؤال

Transcribed Image Text:

Table 1: Time and Motion Study Data Operation No. Work Elements Precedence Performa Normal nce Rating Time (Minutes per Cycle) Observations Number Cycle Time (Minutes per Cycle) 1 2 3 4 5 10 Press out sheet of 100% 2 2 2 IN m 1.5 1.5 fruit 20 Cut into strips 10 100% 30 Outline fun shapes 10 100% 24 2 22 2.2 4 4 40 Roll up and package 20, 30 90% ? 3 4 25 2 1.5 3.5 3.5 5 4 4 Table 2: Production Forecast 1 2 3 4 5 6 Actual Demand in Year 2015 2016 2017 2018 2019 2020 Production Days 25 25 25 25 25 25 Actual Demand (units) 10,000 12,000 14,000 20,000 22,000 ?