تم الحل ✓
categoryهندسة مدنية
schoolبكالوريوس
event_available2026-07-14
السؤال
Transcribed Image Text:
Q2-A temporary fill of 200 kN/m² were placed on the
surface of the soil shown in figure below. After final
consolidation was achieved, the fill removed and a circular
footing (5 m) in diameter was constructed at 2 m below the
ground surface. Estimate
i. Total consolidation settlement due to fill.
iTotal consolidation settlement after 85 days of fill
application.
i. Total heave of the soil surface after of the fill (fill were
removed).
Total consolidation settlement due to footing when
uniform pressure of 100 kN/m² on the footing surface.
W.T
4m Sand
5m clay
Y sat.-18.5 kN/m³
N.G.S
Ysat. 19 kN/m',OCR=1
C-3.533 m2/month
e,-0.95, C=0.3, C=0.05
Rock
ADVANCED SOIL MECHANICS LECTURES by Dr. Mohammed Sh. M. Al
Shakerchy
check_circle الجواب — حل مفصل خطوة بخطوة
hourglass_top
🔒
الحل الكامل متاح للمشتركين
اشترك في أرشيف الأسئلة لعرض هذا الحل وآلاف الحلول المفصلة خطوة بخطوة من معلمين معتمدين.