تم الحل ✓
categoryهندسة صناعية وإنتاج
schoolبكالوريوس
event_available2026-07-14
السؤال
Transcribed Image Text:
At present it takes 30 s to turn a workpiece and the tool must be
reground after 80 workpieces. The Taylor tool-life relation for the
tool-workpiece combination is:
Economics of Metal-Cutting Operations
U10.25=7
where v is the cutting speed (in m/s) and is the tool life (in
seconds).
a. If the loading and unloading of a workpiece takes 20 s (including
the time to return the tool to the beginning of the cut and if it
takes 200 s to change a worn tool, what is the present average
production time per component?
b. If the cutting speed is tripled, what will the new production
time be?
c. If the cutting speed for maximum production rate were used,
what would the tool life be (in seconds)?
check_circle الجواب — حل مفصل خطوة بخطوة
hourglass_top
🔒
الحل الكامل متاح للمشتركين
اشترك في أرشيف الأسئلة لعرض هذا الحل وآلاف الحلول المفصلة خطوة بخطوة من معلمين معتمدين.