2. (15 pts) An intersection has a four-phase signal with the movements allowed in each phase and
the corresponding analysis and saturation flow rates shown in the table below. Please complete
the following:
a. Calculate the sum of flow ratios for the critical lane groups.
b. Calculate the minimum cycle length and effective green time for each phase (balancing v/c
ratio for each lane group). Assume the lost time is 4 sec/phase and a critical intersection v/c
ratio of 0.95 is desired.
c. Calculate the optimal cycle length and corresponding effective green times (based on lane
group v/c equalization). Assume lost time is 4 seconds per phase
Phase
1
2
3
4
Allowed
Movements
EB L, WB L
EB T/R. WB T/R
SB L, SB T/R
NB L, NB T/R
Analysis Flow Rate
245, 230
975, 1030
Sat Flow Rate
1750, 1725
3350, 3400
255, 235
1725, 1750
225, 215
1700, 1750