Transcribed Image Text:

ucing Project Duration 5. Use the information contained below to compress one time unit per move using the leas cost method. Assume the total indirect cost for the project is $700 and there is a savings of $50 per time unit reduced. Record the total direct, indirect, and project costs for each duration. What is the optimum cost-time schedule for the project? What is the cost? Note: The correct normal project duration and total direct cost are provided. Act. PU Crash Cost (Slope) Maximum Crash Time Normal Time ABCDEFG Normal Cost 100 1 40 1 60 1 20 1 40 2353542 100 200 200 ខទី៦៩៩៩៩ 200 200 150 150 0 2 A 2x 哥哥 E win 5 2x Project duration 14 5 F 4 Total direct cost 1,200