Transcribed Image Text:
ucing Project Duration
5. Use the information contained below to compress one time unit per move using the leas
cost method. Assume the total indirect cost for the project is $700 and there is a savings
of $50 per time unit reduced. Record the total direct, indirect, and project costs for each
duration. What is the optimum cost-time schedule for the project? What is the cost?
Note: The correct normal project duration and total direct cost are provided.
Act.
PU
Crash Cost (Slope)
Maximum Crash Time
Normal Time
ABCDEFG
Normal Cost
100
1
40
1
60
1
20
1
40
2353542
100
200
200
ខទី៦៩៩៩៩
200
200
150
150
0
2
A
2x
哥哥
E
win
5
2x
Project duration 14
5
F
4
Total direct cost 1,200