السؤال

Transcribed Image Text:

2. Given below are the ordinates of the mass diagram for a highway project. No haulage is possible pass station 38+50, so this project may be considered the end of the project for this purpose. The free-haul distance is 500 ft. Draw the mass diagram and determine a) the volume of excavation and embankment, b) the quantities of overhaul (station yards), waste and borrow; and c) the direction of haul. Department of Civil Engineering CE 222 Highway Engineering Mass Ordinate (cu yd) 1 Mass Ordinate Station Station (cu yd) 0 0 21 -10,437 1 +481 2 +982 3 +1,343 4 +2,022 5 +3,589 6 +5,567 7 +7,810 7+40 +8,270 8 +7,782 9 +7,465 10 +6,632 11 +4,931 12 +3,214 13 +865 14 -437 15 -2,892 16 -4,504 17 -6,075 22228528322533 -9,333 -8,138 24 -8,985 -11,214 26 -12,482 27 -14,076 -17,451 29 -20,519 30 -23,048 31 -25,110 -27,397 -29,025 34 -26,991 -24,018 36 -18,212 37 -12,222 -7,537 38 +50 -4,238 18 -7,111 19 -7,686 20 -9,122 Spring 2017 Dr. Xinkai Wu

check_circle الجواب — حل مفصل خطوة بخطوة

hourglass_top