quiz حل الأسئلة الجامعية manage_search الأرشيف

تم الحل ✓
categoryهندسة صناعية وإنتاج schoolبكالوريوس event_available2026-07-13

السؤال

Transcribed Image Text:

Lifang Wu owns an automated machine shop that makes precision auto parts. He has just compiled an input-output report for the grinding work center. Period Planned input 2 1 3 4 Total 85 85 105 105 Actual input 90 90 90 90 Deviation Planned output 95 95 95 Actual output 85 85 80 95 80 Deviation Initial backlog: 40 For the given information related to "inputs," the values for deviation and total are: The deviation in period 2 = The deviation in period 4= | The total for "planned inputs" The total for "actual inputs" = The total deviation for "inputs" = units (enter your response as an integer, including a minus sign if necessary). units (enter your response as an integer, including a minus sign if necessary). | units (enter your response as an integer, including a minus sign if necessary). units (enter your response as an integer, including a minus sign if necessary). units (enter your response as an integer, including a minus sign if necessary). For the given information related to "outputs," the values for deviation and total are: The deviation in period 1 = The deviation in period 3 = The total for "planned outputs" The total for "actual outputs" The total deviation for "outputs" units (enter your response as an integer, including a minus sign if necessary). units (enter your response as an integer, including a minus sign if necessary). units (enter your response as an integer, including a minus sign if necessary). units (enter your response as an integer, including a minus sign if necessary). units (enter your response as an integer, including a minus sign if necessary). Fill in the cumulative values for the backlog in each of the periods (given an initial backlog of 40): Period Initial backlog: 40 1 2 3 4 Total

check_circle الجواب — حل مفصل خطوة بخطوة

hourglass_top