Transcribed Image Text:
Engineering Petroleum question
* pressure is 2776 psi.
17. Three exploration wells have been drilled into a newly discov-
ered oil reservoir. Well B is 1400 ft from Well A. Well C is 2200 ft
from Well A, and Well C is 3000 ft from Well B.
1400 ft
2200 ft
3000 ft
B
Well A is an observation well (it has a pressure gauge in the hole
to measure the pressure response due to production from wells B
and C, but is not itself used for production). Well C begins producing
at 200 STB/D at time r=0. Well B begins producing at 100 STB/D
48 hours later.
Reservoir data:
14= 0.27 cp
c1.8x 10-5 psi-
1.23 RB/STB
B,
Pi= 2727 psi
k = 42 md
9=22%
h= 7.5 ft
Well data:
Well A
Well B
Well C
Rate, q
observation well
200 STB/D
200 STB/D
Radius, w
0.33 ft
0.25 ft
0.375 ft
Skin factor, s
5.0
7.5
-1.5
a) Calculate the pressure drop at Well A due to production from
Well B at time r=144 hrs.
b) Calculate the pressure drop at Well A due to production from
Well C at time=144 hrs.
c) Calculate the pressure drop at Well A due to its own skin factor
at timer
144 hrs.
d) Calculate the pressure at Well A at time t=144 hrs