تم الحل ✓
categoryهندسة مدنية
schoolبكالوريوس
event_available2026-07-13
السؤال
Transcribed Image Text:
Chapter 6 | Soil Compaction
6.11 A proposed embankment fill requires 7500 m³ of compacted soil. The void
ratio of the compacted fill is specified as 0.7. Soil can be transported from one
specific gravity of soil solids, and the cost per cubic meter for moving the soil
of the four borrow pits, as described in the following table. The void ratio,
to the proposed construction site are provided in the table.
a.
Determine the volume of each borrow pit soil required to meet the spec-
ification of the embankment site.
b. Make the necessary calculations to select the borrow pit which would be
most cost-effective.
Borrow pit
Void ratio
G
Cost ($/m³)
I
0.85
2.66
11
II
0.92
2.69
8
III
1.21
2.71
9
IV
0.89
2.73
10
ights of a sand were determined in
check_circle الجواب — حل مفصل خطوة بخطوة
hourglass_top
🔒
الحل الكامل متاح للمشتركين
اشترك في أرشيف الأسئلة لعرض هذا الحل وآلاف الحلول المفصلة خطوة بخطوة من معلمين معتمدين.