The time-phased net requirements for the base assembly in a table lamp over the next six
weeks are
Week
1
Requirements 335
2
200
3
4
5
6
140
440
300
200
The setup cost for the construction of the base assembly is $200, and the holding cost is $0.30
per assembly per week
a. What lot sizing do you obtain from the EOQ formula
b. Determine the lot sizes using the Silver-Meal heuristic
c. Determine the lot sizes using the least unit cost heuristic
d. Determine the lot sizes using part period balancing
e. Compare the holding and setup costs obtained over the six periods using the
polices found in parts (a) through (d) with the cost of a lot-for-lot policy