تم الحل ✓
categoryالتاريخ
schoolبكالوريوس
event_available2026-07-15
السؤال
Transcribed Image Text:
(1 point) A manufacturer of downhill and cross-country skis reports that manufacturing time is 2 hours and 4 hours,
respectively, per ski and that finishing time is 3 hours for each downhill and 2 hours for each cross-crountry ski. There are only
20 hours per week available for the manufacturing process and 18 hours for the finishing process. The average profit is $47 for
downhill ski and $75 for cross-country ski. The manufacturer wants to know how many of each type of ski should be made to
maximize the weekly profit.
Maximum profit is: $
when
and
downhill skis
cross country skis are produced.
check_circle الجواب — حل مفصل خطوة بخطوة
hourglass_top
🔒
الحل الكامل متاح للمشتركين
اشترك في أرشيف الأسئلة لعرض هذا الحل وآلاف الحلول المفصلة خطوة بخطوة من معلمين معتمدين.