تم الحل ✓
categoryهندسة النفط
schoolبكالوريوس
event_available2026-07-15
السؤال
Transcribed Image Text:
1.15 The mud logger places a sample of calcium
carbide in the drillstring when a connection is made.
The calcium carbide reacts with the mud to form
acetylene gas. The acetylene is detected by a gas
detector at the shale shaker after pumping 4,500
strokes. The drillstring is composed of 9,500 ft of 5-
in., 19.5-lbm/ft drillpipe and 500 ft of drill collars
having an ID of 2.875 in. The pump is a double-
acting duplex pump with 6-in. liners, 2-in. rods, and
14-in. strokes and operates at a volumetric efficiency
of 80%.
a. Estimate the number of pump cycles required to
move the gas from the surface to the bit. Answer:
1,400 cycles (neglects gas slip).
b. Estimate the number of pump cycles required
to move the gas from the bit to the shale shaker.
Answer: 3,100 cycles.
check_circle الجواب — حل مفصل خطوة بخطوة
hourglass_top
🔒
الحل الكامل متاح للمشتركين
اشترك في أرشيف الأسئلة لعرض هذا الحل وآلاف الحلول المفصلة خطوة بخطوة من معلمين معتمدين.