Transcribed Image Text:
Q2) A manual assembly line is being planned to produce a small consumer appliance. The work elements,
element times, and precedence constraints are indicated in the table below. The workers will work for 420 min/shift
and must produce 350 units/day. A mechanized conveyor, moving at a speed of 1.4 m/min will transport work units
through stations. Manning level is 1.0, and repositioning time is 0.1 min. Because worker service time at each
station is variable, it has been decided to use a tolerance time that is 1.5 times the cycle time. (a) Determine the ideal
minimum number of workers. (b) Use the largest candidate rule to solve the line balancing problem. (c) For your
line balancing solution, compute the balancing efficiency. Determine (d) spacing between work units on the line and
(e) required length of each workstation to satisfy the specifications of the line.
Work
element
T₁(min)
Immediate
predecessors
Work
element
T. (min)
Immediate
predecessors
0.4
8
0.15
0.5
9
0.41
5
0.2
10
0.2
6,7
0.6
11
0.3
8
0.25
2
12
0.33
9,10
0.3
13
0.4
11
0.37
14
0.62
12, 13