السؤال

Transcribed Image Text:

Q2) A manual assembly line is being planned to produce a small consumer appliance. The work elements, element times, and precedence constraints are indicated in the table below. The workers will work for 420 min/shift and must produce 350 units/day. A mechanized conveyor, moving at a speed of 1.4 m/min will transport work units through stations. Manning level is 1.0, and repositioning time is 0.1 min. Because worker service time at each station is variable, it has been decided to use a tolerance time that is 1.5 times the cycle time. (a) Determine the ideal minimum number of workers. (b) Use the largest candidate rule to solve the line balancing problem. (c) For your line balancing solution, compute the balancing efficiency. Determine (d) spacing between work units on the line and (e) required length of each workstation to satisfy the specifications of the line. Work element T₁(min) Immediate predecessors Work element T. (min) Immediate predecessors 0.4 8 0.15 0.5 9 0.41 5 0.2 10 0.2 6,7 0.6 11 0.3 8 0.25 2 12 0.33 9,10 0.3 13 0.4 11 0.37 14 0.62 12, 13

check_circle الجواب — حل مفصل خطوة بخطوة

hourglass_top