تم الحل ✓
categoryهندسة صناعية وإنتاج
schoolبكالوريوس
event_available2026-07-15
السؤال
Transcribed Image Text:
Santa manufacturing wants to design a repetition production line to produce one of its products. The
production process requires 14 tanks, which are limited in the table below, along with the estimated
tank and prudence for each task. Santa wants to produce at least 270 units of products per day. It
expects the production lone to operate 450 minutes per day.
a) Draw a prudence diagram for the tank
b) Compute the maximum cycle time the line can have and still produce at least 270 units(min
production rate)
c) Compute the theoretical minimum number of workstation needed
d) Use the RPWT to construct a production line, clearly throwing which tasks are managed to each
workstation
e) Compute the actual output per da hat would occur with the design from part d
f) Compute the offering of production line
Table 1
TASK
Task information for Santer Mamif'g
TASK TIME
(SEC)
PREDECESSOR
TASKS
A
B
10
25
C
10
D
35
A__
E
65
B.C
F
35
A, E
G
30
부
20
D.G
45
A
J
50
K
20
L
40
JK
M
30
AL.
N
70.
E,H,I, M
TOTAL
TIME T-485
check_circle الجواب — حل مفصل خطوة بخطوة
hourglass_top
🔒
الحل الكامل متاح للمشتركين
اشترك في أرشيف الأسئلة لعرض هذا الحل وآلاف الحلول المفصلة خطوة بخطوة من معلمين معتمدين.