quiz حل الأسئلة الجامعية manage_search الأرشيف

تم الحل ✓
categoryهندسة صناعية وإنتاج schoolبكالوريوس event_available2026-07-15

السؤال

Transcribed Image Text:

Santa manufacturing wants to design a repetition production line to produce one of its products. The production process requires 14 tanks, which are limited in the table below, along with the estimated tank and prudence for each task. Santa wants to produce at least 270 units of products per day. It expects the production lone to operate 450 minutes per day. a) Draw a prudence diagram for the tank b) Compute the maximum cycle time the line can have and still produce at least 270 units(min production rate) c) Compute the theoretical minimum number of workstation needed d) Use the RPWT to construct a production line, clearly throwing which tasks are managed to each workstation e) Compute the actual output per da hat would occur with the design from part d f) Compute the offering of production line Table 1 TASK Task information for Santer Mamif'g TASK TIME (SEC) PREDECESSOR TASKS A B 10 25 C 10 D 35 A__ E 65 B.C F 35 A, E G 30 부 20 D.G 45 A J 50 K 20 L 40 JK M 30 AL. N 70. E,H,I, M TOTAL TIME T-485

check_circle الجواب — حل مفصل خطوة بخطوة

hourglass_top