السؤال

Transcribed Image Text:

A shop works a 400-minute day. The manager of the shop wants an output rate of 200 units per day for the assembly line that has the tasks shown in the following table. Do the following: a. Construct the precedence network and calculate the cycle time. b. Assign tasks according to "Assign the task with the most followers" rule. In the case of a tie, use "Assign the task with the longest time" heuristic rule. c. Calculate the balance delay. Immediately Immediately Precedes Task Precedes Task Task Task(s) Time Task Task(s) Time a b, c, d 0.5 g h 0.4 e 1.4 k 0.3 C e 1.2 i j 0.5 d f 0.7 j k 0.8 e g, j 0.5 k f i 1.0 m E I 0.9 0.3